Place of Origin: | China |
Brand Name: | Aipu |
Certification: | API ISO |
Model Number: | APMC |
Minimum Order Quantity: | 1 sets |
---|---|
Packaging Details: | Sea worthy or customized |
Delivery Time: | 10 days |
Payment Terms: | L/C, T/T |
Supply Ability: | 15 sets/month |
Condition: | New | Warranty: | 1 Year |
---|---|---|---|
Material: | Q345B, 16Mn, Q195-Q345, Etc. | Application Industrial: | CBM Drilling Mud Process |
After-service: | Engineers Available To Service Machinery Overseas | Application: | Drilling Mud Slurry Water Sand Separation |
Product Name: | Mud Recycling System | Use:: | CBM Drilling Mud Process |
Highlight: | Q345B HDD Mud Recycling System,CBM Drilling Mud Recycling System,Welded HDD Mud Recycling System |
A mud tank is an open-top container, typically made of square steel tube and steel plate, to store drilling fluid on a drilling rig.
Application: Various of drilling mud system. Any projects need to store water or fule.
Issues affecting its perfromance: Contained products, object quantity, ambient condition. Such as the temperature, why to hold up, for only storage or any procedure in solids control.Users' preference,etc. All tanks can be customized according to clients' requirement but won't affect practical function and performance.
Main structure: Usually, the tanks including main body, compartment, walk way, stairs, gurad rail, drain gate, man hole, fittings,etc.The pipelines for cable, etc.
Installation: Find out even ground for convenient handle and set up. Minimize the environment effect on tank performance. Put tanks in order according to practical demand based on our layout instruction. Please pay more attention on different tanks function and order as well as the seal and connection between tanks. Furthermore, Aipu will dispatch certain people to do commissioning and training
Legal operation: All tanks will be welded with lifting holes. The certain holes designed with sufficient reliability and balance. During practical operation they are safe please pay attention on lifting holes with mark. Do all the process according to warnings prevent any danger or trouble. Considering operators safety please all workers put on the safety cap make sure no fallings from tank.
Maintenance: The tanks made by Aipu adopted high quality national standard steel. Essentially assure the quality. Professional maintenance will lead tanks long life and good performance.We will do the sand blasting before painting very carefully. The paintings layers including 2-primary, 2-medium, 1-finish. Anyhow, please clean the tanks completely when stop operating it otherwise the drilling fluid will fill up and too hard to clean out. If we don't clean tanks fully the internal content may abrase tank wall since main mud are chemicals. It's very necessary to clean tanks deeply don't keep anything blocked at drain gates or valves.
Warning: Mud tanks play important role during solids control system. If any leakage please inspect all pipe fittings, connections and drain gate at once. Find out the reason as early as possible and do related repairing. If we can't confirm the reason please contact Aipu freely we'll give you solutions at soonest.
Rig |
350-450HP |
550-650HP(ZJ20) |
750HP(ZJ30) |
1000HP(ZJ40) |
1500HP(ZJ50) |
1500HP(ZJ50) |
Mud Flow(m³/h) |
90 |
120 |
180 |
240 |
240 |
300 |
Shaker Qty |
1 |
1 |
2 |
2 |
2 |
3 |
Mud Cleaner |
1 |
1 |
1 |
1 |
1 |
1 |
Centrifuge |
0 |
0 |
1 |
1-2 |
2 |
2 |
Separation Size |
20 micron |
7 micron |
7 micron |
2 micron |
2 micron |
2 micron |
Mud Tank Qty |
2 |
3 |
3 |
5 |
6 |
7 |
Mud Tank Size |
Customized |
|||||
Pipeline Arrange |
Customized |
Solids Control System manufactured by Aipu have a good performance of cold-resistent, high temperature resistance, anti-explosion, anti-leakage, anti-corrosion, raining proof, adapt to wicked condition of well drilling.2.There are intermediate pressure mud pipelines and rinsing pipelines on the top of the tanks.3.Behind the tank, there is a pressure bar type clear sand door. It is appropriate and neat to open.4.To use durable links between the tanks, it is convenient to set up and dismantle, has a good scalability.5.Accurate positioning between tanks, and can connect rapidly.6.The drilling mud solids control level is high, the effect is good, and the measurement of mud is accurate.7.The tanks are composed of corrugated boards of the V type. Holistic rigidity is good and the appearance is pleasing.8.The surface is interpreted with sandblasting. The in-tank is painted with intense anti-corrosion bituminous paint, and outside of the tank is painted by the oil-proof and acid and alkali corrosion resistant paint.9.Comply with the requirements of remote and installation of the drilling crew frequently.10.Drilling Mud Solids Control System can be prepared according to the customers’ requirements
![]() |
Contact Person: Miranda
Tel: +8618109225429
Hunter-MG4 Single Deck 4 panel Drilling Shale Shaker
Two Stage Separation Hunter Hydrocyclone Drilling Mud Cleaner
Forth Phase SS304 Oilfield Drilling Mud Decanter Centrifuge
1 Year Warranty Stainless Steel Sludge Dewatering Centrifuge