Place of Origin: | CHINA |
Brand Name: | AIPU Solids |
Certification: | API, ISO |
Model Number: | DCST |
Minimum Order Quantity: | 10 sets |
---|---|
Price: | USD2206-5150 |
Packaging Details: | Nude |
Delivery Time: | 15 days |
Payment Terms: | L/C, T/T |
Supply Ability: | 20 pcs per month |
Material: | Common Carbon Steel Or Marine Steel | Painting Oil: | Marine Heavy Zinc-rich Epoxy Paint Oil Or Other Corrosion-resistant Process |
---|---|---|---|
Certificate: | CCS, DNV, Etc. | Color: | Blue, Cyan, And So On |
Slings: | Optional | Application: | Offshore Platform Or Onshore |
Highlight: | Mud Skip Waste Management,1500kg Mud Skip,1100kg Mud Skip Waste Management |
CCS Drilling waste management offshore mud skip used in offshore platform
Mud skip is mostly used in offshore platform for drilling waste management. However, present, more and more users in onshore platform use such mud skip to handle waste mud or fluids for concentration process.
For offshore platform, mud skips mainly handle waste drilling fluid or the drilled cuttings to the onshore. They can be stacked one by one occupies less space or area on ship or drilling site. They are used to collect and transfer the materials in a safe and effective way
Model | DCST15 | DCST25 |
Dimension (Customizable) |
2200x1600x1060mm | 3500x1600x1650mm |
Capacity | 2.5m³ | 4m³ |
Weight | 1100kg | 1500kg |
The quality and professional solution is assured here. Just free to contact AIPU Solids control if you have demand or question.
Mud skips are usually put close to solids control part. So we can move the skips easily to load the drilled cuttings. When one skip is filled full with material, next skip will be moved in place to fill in. When the certain number of skips are full, they will be processed together. And when we use the mud skips at onshore drilling site, the full containters will be delivered to a waste mangement center. And then empty all of the boxes to ship them to offshore or deliver to drilling site again for another shuttle.
Good seal on whole box and the covers. The covers can be locked very tight and steady to avoid loose or leakage. The strength is sufficient. According to executive code, we'll test the cutting boxes by drop them down to ground after lift them up to 3ft or higher. This will help to check the hardness. There won't be any deformation, leakage.
Contact Person: Eric
Tel: +8613659244664
Hunter-MG4 Single Deck 4 panel Drilling Shale Shaker
Two Stage Separation Hunter Hydrocyclone Drilling Mud Cleaner
Forth Phase SS304 Oilfield Drilling Mud Decanter Centrifuge
1 Year Warranty Stainless Steel Sludge Dewatering Centrifuge